1989
October - PKII was established by seven professionals and Mr. Mariano M. Santos was appointed as President
December - Actual office operations commenced at Pacific Star Building, Makati City
1990
August - First overseas deployment of Filipino engineers for the construction supervision of the MWEA Irrigation Project, an NK project in Kenya
November - Mr. Jesus M. Sunga was appointed as VP for Operations
1991
July - The First Design Center was established where various design projects such as the USAID-funded projects of the Economic Support Fund (ESF) and the Karawang Industrial Estate Project in Indonesia were undertaken
1992
July - PKII joins the Council of Engineering Consultants in the Philippines (CECOPHIL). Mr. Santos was elected to the Board of Directors and served as Director from 2000 to 2005 and as Secretary in 2000, 2001, and 2004
November - NK, in association with PKII, was awarded the contract for the detailed design of the Agno River Flood Control Project (ARFCP)
1993
December - PKII, in joint venture with UP Consult, was awarded the contract for the Master Plan of Portions of Fort Bonifacio and Villamor Air Base
1996
March - NK, in joint venture with PKII and Hydroterre Consultants, was awarded the contract for the Agrarian Reform Support Infrastructure Project (ARISP)
1997
March - NK, in joint venture with PKII, commenced services for the Mt. Pinatubo Hazard Urgent Mitigation Project
2000
September - PKII, in collaboration with NK, initiates the conduct of preliminary traffic and alignment study for the Subic-Clark-Tarlac Expressway Project which became the basis of the Japanese ODA (Obuchi Fund)
2006
January - PKII established its International Consulting Group (ICG) with Ms. Zenaida N. Abad appointed as VP for ICG. During its maiden year of operations, major projects included the Doha West Sewage Treatment Works Project in Qatar, and the JICS-funded Earthquake Reconstruction and Rehabilitation Project in Pakistan
2008
April - Mr. Peter S. Samoza was appointed as PKII President after retirement of Mr. Santos
2010
January - The new Design Center was established to undertake off-site design services of overseas projects. Major projects undertaken include the Baghdad Sewerage Facilities Improvement Project and the Erbil International Airport, both in Iraq
PKII was awarded its first contract with MNTC Corporation (now NLEX Corporation) for the detailed design of retrofitting of bridges along the North Luzon Expressway (NLEX)
2011
February - PKII developed the Nippon Koei Group HR Database System
December - PKII’s VP for ICG, Ms. Zenaida Abad, was elected President of CECOPHIL, the first and only womanpresident in the organization’s 35-year history. She served a 3-year term as President until December 2014
2012
April - PKII was awarded its first contract with SMC Infrastructure for the feasibility study of the Pangasinan Bulk Water Supply Project
October - NK, in JV with PKII and IKI, won the contract for detailed design and construction supervision ofNational Road No. 1 Upgrading Project in Timor-Leste,the first overseas NKG south collaboration
2013
October - PKII participated in the First NK Group Company Meeting in Tokyo, Japan
2014
April - NK, in association with PKII, Hydroterre and SDS, commenced engineering services for the National Irrigation Systems Rehabilitation and Improvement Project (NISRIP)
October - PKII commemorates its Silver Anniversary
2015
January - PKII’s first deployment of engineers to Bangladesh for the NK-led Port and Reclamation component of the Matarbari Coal-Fired Power Project
November - PKII obtained its first ISO 9001 certificate issued by TUV Rheinland Philippines, Inc.
2016
March - PKII moves to its new home, The Orient Square Building, Ortigas Center, Pasig City
April - PKII commenced detailed design services for the MRT-7 Project, its first involvement in an EPC contract, as design sub-consultant of EEI Corporation
July - PKII, in JV with NK and AECOM, was awarded the contract for the Master Plan of Clark Green City now known as New Clark City
November - PKII, in JV with NK, won a major international contract for the ADB-funded detailed design and construction supervision of the Cambodia Urban Water Supply Project
2017
April - PKII, in JV with NK, Katahira and Nippon Engineering, commenced the detailed design of the Davao City Bypass Construction Project
May - PKII, in JV with Foresight, ESCA and UICI, was awarded its first contract for Independent Consultant (IC) services for the NLEX-SLEX Connector Project
2018
December - PKII, in JV with TAM Planners, won two contracts with NEDA for the master plans of Sustainable Urban Infrastructure forButuan City and Calapan City
PKII deployed its 250th Engineer Overseas
2019
February - PKII, under sub-contract with NK, commenced the detailed design of the Greater Yangon Water Supply Project, Phase II, in Myanmar
March - PKII, in JV with Foresight, commenced the Project Management and Construction Supervision of SLTC Toll Road-4 Project under SMC Infrastructure
September - NK, in JV with PKII, was awarded the contract for the Infrastructure Design of the New Clark City October - PKII celebrates its Pearl Anniversary
1989
October - PKII was established by seven professionals and Mr. Mariano M. Santos was appointed as President
December - Actual office operations commenced at Pacific Star Building, Makati City
1990
August - First overseas deployment of Filipino engineers for the construction supervision of the MWEA Irrigation Project, an NK project in Kenya
November - Mr. Jesus M. Sunga was appointed as VP for Operations
1991
July - The First Design Center was established where various design projects such as the USAID-funded projects of the Economic Support Fund (ESF) and the Karawang Industrial Estate Project in Indonesia were undertaken
1992
July - PKII joins the Council of Engineering Consultants in the Philippines (CECOPHIL). Mr. Santos was elected to the Board of Directors and served as Director from 2000 to 2005 and as Secretary in 2000, 2001, and 2004
November - NK, in association with PKII, was awarded the contract for the detailed design of the Agno River Flood Control Project (ARFCP)
1993
December - PKII, in joint venture with UP Consult, was awarded the contract for the Master Plan of Portions of Fort Bonifacio and Villamor Air Base
1996
March - NK, in joint venture with PKII and Hydroterre Consultants, was awarded the contract for the Agrarian Reform Support Infrastructure Project (ARISP)
1997
March - NK, in joint venture with PKII, commenced services for the Mt. Pinatubo Hazard Urgent Mitigation Project
2000
September - PKII, in collaboration with NK, initiates the conduct of preliminary traffic and alignment study for the Subic-Clark-Tarlac Expressway Project which became the basis of the Japanese ODA (Obuchi Fund)
2006
January - PKII established its International Consulting Group (ICG) with Ms. Zenaida N. Abad appointed as VP for ICG. During its maiden year of operations, major projects included the Doha West Sewage Treatment Works Project in Qatar, and the JICS-funded Earthquake Reconstruction and Rehabilitation Project in Pakistan
2008
April - Mr. Peter S. Samoza was appointed as PKII President after retirement of Mr. Santos
2010
January - The new Design Center was established to undertake off-site design services of overseas projects. Major projects undertaken include the Baghdad Sewerage Facilities Improvement Project and the Erbil International Airport, both in Iraq
PKII was awarded its first contract with MNTC Corporation (now NLEX Corporation) for the detailed design of retrofitting of bridges along the North Luzon Expressway (NLEX)
2011
February - PKII developed the Nippon Koei Group HR Database System
December - PKII’s VP for ICG, Ms. Zenaida Abad, was elected President of CECOPHIL, the first and only womanpresident in the organization’s 35-year history. She served a 3-year term as President until December 2014
2012
April - PKII was awarded its first contract with SMC Infrastructure for the feasibility study of the Pangasinan Bulk Water Supply Project
October - NK, in JV with PKII and IKI, won the contract for detailed design and construction supervision ofNational Road No. 1 Upgrading Project in Timor-Leste,the first overseas NKG south collaboration
2013
October - PKII participated in the First NK Group Company Meeting in Tokyo, Japan
2014
April - NK, in association with PKII, Hydroterre and SDS, commenced engineering services for the National Irrigation Systems Rehabilitation and Improvement Project (NISRIP)
October - PKII commemorates its Silver Anniversary
2015
January - PKII’s first deployment of engineers to Bangladesh for the NK-led Port and Reclamation component of the Matarbari Coal-Fired Power Project
November - PKII obtained its first ISO 9001 certificate issued by TUV Rheinland Philippines, Inc.
2016
March - PKII moves to its new home, The Orient Square Building, Ortigas Center, Pasig City
April - PKII commenced detailed design services for the MRT-7 Project, its first involvement in an EPC contract, as design sub-consultant of EEI Corporation
July - PKII, in JV with NK and AECOM, was awarded the contract for the Master Plan of Clark Green City now known as New Clark City
November - PKII, in JV with NK, won a major international contract for the ADB-funded detailed design and construction supervision of the Cambodia Urban Water Supply Project
2017
April - PKII, in JV with NK, Katahira and Nippon Engineering, commenced the detailed design of the Davao City Bypass Construction Project
May - PKII, in JV with Foresight, ESCA and UICI, was awarded its first contract for Independent Consultant (IC) services for the NLEX-SLEX Connector Project
2018
December - PKII, in JV with TAM Planners, won two contracts with NEDA for the master plans of Sustainable Urban Infrastructure forButuan City and Calapan City
PKII deployed its 250th Engineer Overseas
2019
February - PKII, under sub-contract with NK, commenced the detailed design of the Greater Yangon Water Supply Project, Phase II, in Myanmar
March - PKII, in JV with Foresight, commenced the Project Management and Construction Supervision of SLTC Toll Road-4 Project under SMC Infrastructure
September - NK, in JV with PKII, was awarded the contract for the Infrastructure Design of the New Clark City October - PKII celebrates its Pearl Anniversary