Bases Conversion Development Authority |
| |
Detailed Design and Construction Supervision |
 |
Construction of a new toll road consisting of two sections: the Subic-Clark Special section from the Subic Tipo junction to the Clark Special Ecozone with a length of 56 kms, and the Clark-Tarlac section which is an extension of the North Luzon Expressway up to Tarlac City, with a length of 34 kms. |
| Download PDS (111Kb) |
|
|
|
|
|
|
| |
|
|
| |
Department of Public Works and Highways (DPWH) |
| |
Detailed Design and Construction Supervision |
 |
Rehabilitation of the existing 208-km circumferential road network of the province of Catanduanes, with about 90 kms of PCCP and the remaining 118 km of gravel pavement, including reconstruction of about 15 bridges, improvement of drainage system and slope protection measures at disaster-prone areas. |
| Download PDS (119Kb) |
|
|
|
|
|
|
| |
|
|
| |
DPWH/Provincial Government of Occidental Mindoro |
| |
Detailed Design and Construction Supervision |
 |
Upgrading of three critical sections of the main trunkline of Occidental Mindoro namely: San Jose-Rizal, Sablayan - Sta. Cruz and Mamburao - Abra de Ilog, with a total length of 107 kms, which have been seriously damaged by flood, embankment failures, scouring, slope failures and aggradation/degradation of river deposits. |
| Download PDS (71Kb) |
|
|
|
|
|
|
| |
|
|
| |
Department of Public Works and Highways |
| |
Detailed Design and Construction Supervision |
 |
Reconstruction of Bamban Bridge along McArthur Highway, designed as a Neilsen Basket Arch Bridge, with an arch span of 177 m, with a steel box superstructure and 48 - 1.2m bored-pile foundation at the abutments. |
|
|
|
|
|
|
| |
|
|
| |
Bases Conversion Development Authority |
| |
Detailed Design and Construction Supervision |
 |
Reconstruction of Mabalacat Bridge along McArthur Highway, designed as three-span steel girder bridge with a total length of 156 m, with 16 - 1.2m bored-piles at the abutments, and 18 - 1.2m bored piles at the piers. |
|
|
|
|
|
|
| |
|
|
| |
Bases Conversion Development Authority |
| |
Detailed Design and Construction Supervision |
 |
Construction of an 11-span bridge with a continuous, post-tensioned, prestressed concrete T-girder superstructure on bored-pile foundation, with a total length of 392 meters. |
|
|
|
|
|
|
| |
|
|
| |
Bases Conversion Development Authority |
| |
Detailed Design and Construction Supervision |
 |
Reconstruction of a 12-span, 1-km bridge that will provide a direct link between the town of Alcala and Bayambang in Pangasinan |