|
|
|
|
|
|
|
|
|
|
|
|









 |
» Home > Projects > Flood Control and Drainage |
 |
| |
|
|
|
|
| |
|
|
| |
Department of Public Works and Highways (DPWH) |
| |
Detailed Design and Construction Supervision |
 |
Improvement of Lower Agno River and Upper Sinocalan River consisting of new channeling and dredging works (8.8 million cu.m.), dike heightening (93,000 cu.m.), revetment works (1,800 m) and construction of Bugallon Bridge (393 m) |
| Download PDS (98Kb) |
|
|
|
|
|
|
| |
|
|
| |
Department of Public Works and Highways (DPWH) |
| |
Detailed Design and Construction Supervision |
 |
Improvement of the Upper Agno River extending from Wawa Bridge to Alcala near the entrance of the existing floodway, with a total length of 23 kms, consisting of the construction of new floodway and closure dike, heightening of existing dike, and construction of new dikes, revetments, groins and bridges |
| Download PDS (129Kb) |
|
|
|
|
|
|
| |
|
|
| |
Department of Public Works and Highways (DPWH) |
| |
Detailed Design and Construction Supervision |
 |
Flood and mudflow control works in Sacobia-Bamban and Pasig-Potrero River Basins, involving the restoration of Highway Route 3, construction of Bamban and Mabalacat Bridges, and river training works for Bamban and Sacobia Rivers which include channel excavation, dike construction, dike heightening and construction of consolidation dam and slope protection works |
| Download PDS (107Kb) |
|
|
|
|
|
|
| |
|
|
| |
Department of Public Works and Highways (DPWH) |
| |
Detailed Design and Construction Supervision |
 |
Construction of flood and mudflow control works and planning of non-structural measures in the Pasig-Potrero River Basin, updating of agricultural development planning in the Sacobia - Bamban River Basin, and monitoring and planning of flood and mudflow control works in Third River and Pasac Delta Area (including downstream stretch of Porac-Gumain River) |
| Download PDS (98Kb) |
|
|
|
|
|
|
| |
|
|
| |
Department of Public Works and Highways (DPWH) |
| |
Detailed Design and Construction Supervision |
 |
Flood control works for the Lower Agusan River Basin involving the improvement of the east bank, construction of cut-off channel, reconstruction of the Magsaysay Bridge/ Viaduct, improvement of the Banza and Masao Rivers and rehabilitation of the Butuan City urban drainage system |
| Download PDS (109Kb) |
|
|
|
|
|
|
| |
|
|
| |
Department of Public Works and Highways (DPWH) |
| |
Detailed Design and Construction Supervision |
 |
Flood control and drainage improvement works in KAMANAVA area consisting of the construction of polder dikes (8 km), raising of river wall (12.4 km), construction of navigation lock (1 site), flood gates (5 sites), control gates (2 sites), pumping stations (7 sites), and improvement of existing drainage canals |
| Download PDS (109Kb) |
|
|
|
|
|
|
| |
|
|
| |
Department of Public Works and Highways (DPWH) |
| |
Feasibility Study |
 |
Improvement of Tarlac River by dredging of the riverbed and heightening/reinforcement of the dike structures utilizing cement-treated lahar material |
| Download PDS (99Kb) |
|
|
|
|
|
| |